Case Study: Music, Drama and Dance Conversion at Fort Pitt Grammar School
Project Overview
Fort Pitt Grammar School in Rochester had poor teaching facilities in its converted Grade 2 listed Florence Nightingale Hospital Building. The project included the strip out (of non-listed items), significant structural wall alterations and reinforcements, extensive refurbishment and remodelling to provide the following new accommodation:
- Reconfiguration of building into Five Classrooms. Including two specialist Music Classrooms and 10 music practice rooms.
- Specialist Drama Studio with new lighting and sound rigs, black our blinds and retractable curtains.
- Specialist Dance Studio with floor to ceiling mirrors and new rig lighting.
- Installation of bi-folding acoustic wall between Drama and Dance Studios.
- 2 new external fire escape stair cases.
The works also comprised the installation of new Variable Refrigerant Flow (VRF) air-source heat pump to provide heating and cooling and installation of Mechanical Ventilation and Heat Recovery (MVHR) units.
- Location: Rochester, Kent
- Client: Beyond Schools Trust, Fort Pitt Grammar School
- Sector: Education
- Project Duration: 2022 – 2024
- Services Provided: Coordination of Design Team, Specification Writing, Tender, Project Management and Contract Administration
Our Role / Services Provided
From initial assessment through to project completion, our team worked closely with the school to provide end-to-end project consultancy services, including:
- Initial survey and design options
- Leading of full design team to include architect, structural engineer, quantity surveyor, acoustic engineer and planning consultant.
- Overseeing planning application submission
- Detailed specification writing
- Tender issue, evaluation and contractor selection
- Contract administration and progress monitoring
- On-site inspections and quality assurance reporting
- Final snagging and compliance sign-off
Results & Outcomes
- School provided with state-of-the-art music, drama and dance accommodation for its students.
- Flexible Drama and Dance space provided with acoustic bi-folding wall.
- Sustainable VRF system installed reducing carbon footprint from previous cast iron radiators and gas boiler.
- Refurbishment and repurposing a historic building.