Case Study: Fire Compliance, Heating Distribution, Boiler Replacement and Electrical Rewire at Abbey Primary School
Project Overview
Abbey Primary School, located in the London Borough of Merton, required a phased upgrade to key building systems to ensure regulatory compliance, improve energy efficiency, and to replace ageing infrastructure. Over the course of three years, our team have delivered a series of planned upgrades, including Fire Compliance works in 2023, a full Heating Distribution system replacement in 2024 and a Boiler renewal and a comprehensive Electrical Rewire in 2025.
- Location: Merton, London
- Client: Abbey Primary School
- Sector: Education
- Project Durations: 2023 – 2025
- Services Provided: Project Management, Specification Writing, Cost Consultancy, CIF Bid Writing, Contract Administration, Compliance Management
Our Role / Services Provided
We were engaged to provide multidisciplinary consultancy services across the full project life cycle for each individual project, including:
- Initial condition surveys and project scoping
- Technical specification development for M&E and fire safety systems
- CIF Bid support for each separate project
- Tender management and contractor recommendation
- Construction phase project management and quality assurance
- Contract administration and cost control
- Compliance review and certification sign-off
Scope of Works Completed
Fire Compliance (2023)
- Replacement of 100 non-compliant internal fire doors with certified FD30 and FD60-rated units
- Installation of a new fire alarm system and detectors
- Replacement of 111m² of non-compliant internal glazing with fire-rated glazing
- Installation of new compliant fire exit signage throughout the school
- Installation of emergency lighting to all areas
- Installation of compliant external fire doors with panic ironmongery
Heating Distribution (2024)
- Full replacement of single-fed heating pipework system
- Removal of old cast-iron radiators and installation of modern radiators with thermostatic controls
- Upgrade to zoned heating controls for improved energy efficiency
Boiler Replacement (2025)
- Decommissioning and removal of life-expired gas-fired boiler
- Installation of high-efficiency condensing boiler plant
- New plant room pipework, flueing system, and controls
Electrical Rewire (2025)
- Full replacement of all electrical distribution boards and sub-mains cabling
- Installation of new general power circuits and sockets throughout
- Upgrade to energy-efficient LED lighting across all teaching, admin, and circulation areas
Results & Outcomes
All works completed in holiday periods or out of hours to minimise disruption to the school’s operation.
- Achieved full compliance with current fire safety, heating, and electrical regulations.
- Improved thermal comfort and energy efficiency throughout the building.
- Modernised M&E systems reducing long-term maintenance and operational risks.
- Very positive feedback from the school on the delivery of critical H&S and compliance works, whilst improving the school’s estate and its teaching and learning environment.