Case Study: Pitched Roof Clay Tile Replacement at Valley Primary School
Project Overview
Valley Primary School in Bromley was experiencing significant roof-related issues, including persistent leaks, Mold growth, and poor thermal performance. These conditions posed a risk to both the structural integrity of the building and the comfort of its occupants. A full replacement of the existing pitched clay tile roof was commissioned to resolve these concerns and enhance the school’s overall energy efficiency and resilience.
- Location: Bromley, Greater London
- Client: Valley Primary School
- Sector: Education
- Project Duration: July 2023 – October 2023
- Services Provided: Condition Survey, Specification Writing, Tender, CIF Bid Application, Project Management, Health & Safety Compliance, Contract Administration
Our Role / Services Provided
From initial assessment through to project completion, our team worked closely with the school to provide end-to-end project consultancy services, including:
- Site survey and roof condition assessment
- Specification of pitched roofing project
- Tender evaluation and contractor selection
- CIF Bid preparation alongside client and submission
- Contract administration and progress monitoring
- On-site inspections and quality assurance reporting
- Final snagging and compliance sign-off
Scope of Works Completed
- Careful removal of existing clay tiles, underlay, and battening
- Installation of modern, breathable membrane system
- New treated timber battens fitted to current standards
- Installation of high-performance insulation to improve thermal retention
- Laying of new high-quality clay tiles, maintaining aesthetic continuity with the existing structure and age of building.
- Detailed waterproofing around chimneys, valleys, and junctions to prevent future leaks
Results & Outcomes
- Historical roof leaks fully resolved with comprehensive waterproofing solution
- Elimination of mold and damp conditions through improved ventilation and materials
- Substantial improvement in thermal efficiency due to new insulation and underlay system
- Roof aesthetics retained with premium clay tile finish
- Works delivered on time and within budget, with zero disruption to school operations
Client Feedback
Valley Primary School commended the team for professional project coordination and delivering a long-lasting roofing solution that now meets all safety and performance expectations.




















